top of page
reference projects oil and gas_edited_ed

References

Fiber Optic Infrastructure Refineries Scholven and Horst - Client: BP Gelsenkirchen

Construction management including coordination of all installation activities for the DCS/fiber optic infrastructure at the Scholven and Horst refineries for Ruhr Oel GmbH – BP Gelsenkirchen. Responsibilities covered scheduling, cost control, quality assurance, permitting, contractor management, and site logistics, ensuring compliance with safety, health, environmental, and quality standards.

fiber optics 24 cores tube with orange cover inside refinerie .jpg

Fujairah Phase 2 Water Transmission System - Client: Transco

Carvalho Engineering Consulting delivered comprehensive pipeline engineering services for the Fujairah Phase 2 Water Transmission System project, covering 130km of DN1600 pipeline. Our scope included complete material requisitioning, detailed material specifications, engineering calculation reports, precise pipeline alignment sheets, construction phase support, commissioning assistance, and vendor dossier preparation for all materials. This critical infrastructure project required meticulous planning to ensure optimal water transmission capacity and system reliability.

 Fujairah Phase 2 Water Transmission System project, covering 130km of DN1600 pipeline.jpg

FGP (Future Growth Project) EPC project in Kazakhstan - Clients: TengizChevrOil (TCO) and Chevron

Technical consultant for the USD 10 billion FGP (Future Growth Project) EPC in Kazakhstan for TengizChevrOil (TCO) and Chevron, specializing in the production of alignment sheets and related technical documentation, as well as HDPE and PE-RT pipes and fittings. Responsibilities included supervising junior engineers, preparing reports and cost estimates, managing deliverables and interdisciplinary interfaces, and ensuring compliance with international and Kazakh technical standards

crude export pipeline interface to pig trap.jpg

Horst Refinery Fire Brigade Station - Construction Management - Client: BP Gelsenkirchen

Comprehensive construction management services were provided for the new fire brigade facility at BP Gelsenkirchen's Horst Refinery. The project encompassed complete oversight from construction phase through final approvals, ensuring seamless coordination between multiple contractors and stakeholders. The project required extensive liaison with both technical authorities and city planning departments to achieve full regulatory compliance for this critical safety infrastructure.

brand new very big  with 4 car doos fire brigade building from outside in a refinery area.
bottom of page